London Operations Site
Warning
2 active incidents · 6 unknown systems
First issue detected
ELECTION-DATA-01
ELECTION-DATA-01 freshness threshold breach.
Affected
None confirmed
Unknown
Live customer impact is not verified; current evidence is simulated.
Primary service
MAIN OTT
Service Health
Operational
Impact
At Risk
Dependency Risk
Warning
Evidence
mixed
the primary path is operational, with warning supporting dependency risk.
Data / Metadata Assurance
Election Graphics Data
STALE
Freshness
Primary election result: 47.3% is stale; last confirmed 4m 18s ago against 30s threshold.
Provenance
ELECTION-DATA-01 (licensed_provider); observed; canonical state canonical.
Verification
unverified; confidence 0.92.
Fallback
Fallback not configured.
Output Impact
Required operational data is at risk, but confirmed output impact is unknown without final output/as-run evidence.
Evidence state
What this browser can display
0
Live
0
Stale
6
Unavailable
23
Simulated
Stale, unavailable, partial, simulated, and uncollected evidence is never promoted to verified healthy state.
London Operations Site · Site / Service StateSimulated evidence
Warning
Production graphics election data stale
ELECTION-DATA-01Customer impact: Unknown · Live customer impact is not verified.
First issue detected
ELECTION-DATA-01
ELECTION-DATA-01 freshness threshold breach.
Observed condition
The Production Graphics renderer remains healthy, but its required election data value 47.3% is stale against the configured 30s freshness threshold.
Potential impact
Production Graphics is At Risk because required editorial data is stale. Incorrect on-air graphics are not confirmed without output/as-run evidence.
Latest incident evidence
09:46:45
PCR-SW-01 · Programme bus output remained active with the configured graphics feed available.
Affected
None confirmed
At Risk
Live News Production, Production Graphics
Unaffected
None verified
Unknown
Live customer impact is not verified; current evidence is simulated.
Monitoring coverage
0 full · 0 partial · 6 none · 23 simulated
Data / Metadata Assurance
Election Graphics Data
STALE
Freshness
Primary election result: 47.3% is stale; last confirmed 4m 18s ago against 30s threshold.
Provenance
ELECTION-DATA-01 (licensed_provider); observed; canonical state canonical.
Verification
unverified; confidence 0.92.
Fallback
Fallback not configured.
Output Impact
Required operational data is at risk, but confirmed output impact is unknown without final output/as-run evidence.
MAIN OTT Workflow
Primary media path · service state and dependency risk are assessed separately.
01 · Final PGM
Upstream programme handoff
MCR-PLAYOUT-01Healthy
required · simulatedAt risk · MEDIA-NAS-01
PGM-QA-01Unknown
optional · unavailable
Final PGM A/V feed
Stage healthOperational
Dependency riskWarning
CoveragePartial
02 · Encoding
Final PGM compression
ENC-01Healthy
required · simulated
SRT egress
Stage healthOperational
Dependency riskNone
CoverageSimulated
03 · Transport
IP contribution
INET-UPLINK-01Healthy
required · simulatedAt risk · CORE-SW-01
SRT contribution
Stage healthOperational
Dependency riskWarning
CoverageSimulated
04 · Cloud / Distribution
Transcode, origin, and CDN
CLOUD-TRANS-01Healthy
required · simulated
ORIGIN-01Healthy
required · simulated
+1 systems in service detail
ABR rendition outputs · Packaged HLS/DASH
Stage healthOperational
Dependency riskNone
CoverageSimulated
05 · Viewer QA
Delivery-path validation
OTT-QA-MON-01Healthy
required · simulated
OTT playback validation
Stage healthOperational
Dependency riskNone
CoverageSimulated
Supporting dependencies
Timing0 mapped
No dependency configured
Operational Services
Service outcome, supporting risk, evidence, and impact are assessed independently.
Contribution
Incoming source and contribution-receiver handoff into facility routing.
Impact
Unknown
Dependency risk
None
Evidence
simulated
Live News Production
Representative routed-source, PCR vision, programme-audio, graphics, and final-programme workflow.
Impact
Unknown
Dependency risk
None
Evidence
mixed
Media Ingest & Assets
Representative routed recording, shared storage, media-asset management, and production-access workflow.
Impact
At Risk
Dependency risk
Warning
Evidence
mixed
Production Graphics
Representative data-source, data/metadata processing, graphics control, render, and configured production-switcher insertion workflow.
Impact
At Risk
Dependency risk
Warning
Evidence
simulated
MAIN OTT
Representative final-programme-to-viewer OTT distribution workflow sourced from Live News Production.
Impact
At Risk
Dependency risk
Warning
Evidence
mixed
Observed Health
Current evidence only; coverage is separate.
21
Healthy
2
Warning
0
Critical
6
Unknown
Monitoring Coverage
Collection completeness, not health.
0
Full
0
Partial
6
None
23
Simulated
Recent Operational Activity
Latest warning and service-path evidence.
MEDIA-NAS-01Storage utilization reached 162 TB of 200 TB (81%), exceeding the 160 TB (80%) warning threshold.09:42:03ELECTION-DATA-01Election graphics value 47.3% last confirmed 4m18s ago, exceeding the configured 30s freshness threshold. Fallback is not configured; final output/as-run evidence is not collected.09:45:34ENC-01Downstream contribution receiver reported a packet loss increase while CORE-SW-01 showed elevated utilization and output discards.09:45:58FAC-SYNC-01Facility reference remained locked; holdover was not active.09:46:41INET-UPLINK-01Primary internet transit path carrying SRT contribution to cloud ingest/transcode.09:45:55